Formworkers, scaffolders, yard workers and forklift operators were singled out. For each group, the place of work and functions were specified: assembling systems, preparing kits, sorting equipment or moving around the site.
PERI
We recruited formwork installers, scaffolders, yard workers and forklift operators for PERI.
PERIFormwork & scaffoldingPERI develops and supplies formwork and scaffolding systems. Its staffing brief included assembly, equipment preparation, sorting and movement of components in the storage yard.
Installers needed experience assembling systems and reading instructions. For yard workers, we discussed handling components, preparing them for reuse and storage procedures. Forklift operators were assessed on equipment use and load handling.
We recruited in Moldova and reviewed candidates’ experience with PERI. Each vacancy was assessed for skills, independence and readiness before agreeing on installation or warehouse assignments.
Equipment, people and proper distribution of roles

We clarified the assembly of systems, reading diagrams and preparing kits. Sorting of items and forklift experience were discussed separately, analyzing the tasks of each candidate on the warehouse site.
When recruiting in Moldova, candidates’ skills were linked to a specific function. We clarified the independence of installers, the training of support workers and the requirements for clearances, then discussed the readiness of people to leave.
We discussed composition changes through work functions. We clarified who is needed for installation, preparation of kits and movement of equipment, maintaining contact with the client’s request.
For PERI, we recruited workers to assemble systems and prepare equipment. Installation experience, component handling and forklift operation were assessed separately before agreeing on team roles with the client.
The request combined assembly and warehouse functions: formwork workers, scaffolders, yard workers and forklift operators. Their experience was assessed separately, then the overall mix of skills was agreed upon.
There are several different tasks surrounding one set of formwork or scaffolding: preparing the elements in the yard, assembling the desired set, moving it and completing the installation.
Working with elements of formwork systems: preparation, connection and disassembly according to a given pattern. When selecting, experience with system formwork, understanding of the installation sequence and careful handling of reusable elements are important.
Assembling and disassembling structures according to the established order. The profile requires a separate assessment of practice and clearance requirements; general construction experience does not reveal skills in handling components and elements of a specific system.
Yard workers receive, sort and prepare sets of equipment for delivery. The drivers' experience with equipment and moving goods was checked, and the warehouse workers' knowledge of the elements, completeness and order of placement of systems on the site were checked.
The installation request varies depending on the system and stage of construction. Therefore, we linked the staffing of people with the work assignment: what profile is needed at the site, where an independent specialist is required, and what access requirements must be confirmed by the employer.
With PERI, we clarified the need separately for installation, preparation of kits and movement of equipment. We analyzed the experience of the proposed employees and the requirements for positions, so that if the request changes, we could look for people with the appropriate skills and readiness to work.